Over the next two years, U.S. Group, Inc., as the contractor responsible for the S.C. 901 widening project, will be busy working on widening and improving this key roadway, as well as improving adjacent roads. This project will fulfull a long-time vision of creating a regional bypass around Rock Hill, connecting central York County directly to Interstate 77.

Generally, construction projects move in the following matter:

  • Clearing the roadway and moving utilities.
  • Grading operations and installation of storm drain pipes. Bridge work will usually begin during this stage.
  • Work on final grade of roadway and concrete items, such as curb, gutter, and sidewalks.
  • Paving of the new areas of the roadway. Bridge work usually will be completed during this stage.
  • Repair and improve the existing roadway.
  • Install signs, striping and pavement markers (reflectors).
  • Open the new roadway.
  • Clean-up and final detail work.
Using this guide, you can keep up with the progress of work. But please keep in mind that due to the different circumstances of every project, some of these details may vary in order, as well as duration.

This project will include the following improvements and changes:

  • Widen S.C. Route 901 to four lanes between Albright Road (S.C. 72/121) and Interstate 77, with a center turning lane.
  • Widen and improve two existing bridges on S.C. Route 901.
  • Widen Saluda Street to four lanes from Heckle Boulevard to Albright Road.
  • Realign Saluda Street to end at the S.C. 901/Albright Road traffic light to eliminate the hazardous fork at the end of Saluda Street. Traffic heading north on 72/121 towards Rock Hill will have two left-turn lanes to get on Saluda Street.
  • The section S.C. 901 to be four-laned will have over a dozen marked left-turn lanes and two U-turn locations, and Albright Road, south of S.C. 901, will have two new left-turn lanes. These side roads will have center left-turn lanes created as part of the widening project:
    • S.C. Route 901:
      Ashridge Road
      Branch Street
      Brookdale Street
      Caldwell Street
      Glenarden Street
      Lazy Hawk Road
      Long Meadow Road
      Marshall Road
      Mecca Trail
      Mt. Holly Road
      Oakdale Road
      Pearson Street
      Serenity Lane
    • S.C. Route 72, south of S.C. 901
      Grier Street
      Laney Terrace

This map below shows which roads will be part of this widening proect (highlighted in orange):

If you have any questions or concerns, we'd like to hear from you.


WORK
ZONE
TRAFFIC
ALERT!

When traveling through work zones, always watch out for workers and equipment.

Be alert for slowed or stopped traffic.

Copyright © 2008 U.S. Group, Inc. All Rights Reserved.